Grocery Tote Bags

$28.00

Using repurposed burlap coffee bean bags, our grocery tote is the right size and shape for easy packing and hauling. Handcrafted with 95% post-consumer material. Gives the planet a break! Do not wash as burlap will shed. If stained can spot wash the straps. Do not leave in direct sunlight.

Category:

Description

Using repurposed burlap coffee bean bags, our grocery tote is the right size and shape for easy packing and hauling.
Handcrafted with 95% post-consumer material.
Gives the planet a break!

Do not wash as burlap will shed.
If stained can spot wash the straps.
Do not leave in direct sunlight.

Additional information

Weight 0.42 lbs
Dimensions 4 × 7.5 × 0.75 in
Sweet Dreams

2023 ©