Description
Cinch bags are a small backpack with drawstring closure.
Brightly colored, durable broadcloth, perfect for being on the go.
Wash in cold water, hang to dry.
Cinch bags are a small backpack with drawstring closure. Brightly colored, durable broadcloth, perfect for being on the go. Wash in cold water, hang to dry.
Cinch bags are a small backpack with drawstring closure.
Brightly colored, durable broadcloth, perfect for being on the go.
Wash in cold water, hang to dry.
Weight | 0.42 lbs |
---|---|
Dimensions | 4 × 7.5 × 2 in |