Yoga Mat Bag (out of stock)

$35.00

Our yoga mat bags are made from high quality broadcloth. They feature a zippered front pocket, an adjustable strap, a reinforced bottom and a drawstring with toggle. Our Yoga Mat Bags are 30″ height and 11 1/2″ width. All sweet dreams products are hand-crafted therefore size is slightly approximate. Wash in cold water with like…

Out of stock

Category:

Description

Our yoga mat bags are made from high quality broadcloth. They feature a zippered front pocket, an adjustable strap, a reinforced bottom and a drawstring with toggle.

Our Yoga Mat Bags are 30″ height and 11 1/2″ width. All sweet dreams products are hand-crafted therefore size is slightly approximate.

Wash in cold water with like colors and hang dry. Do not leave in direct sunlight.

Additional information

Weight 0.5 lbs
Dimensions 6.5 × 12 × 2 in

You may also like…

Sweet Dreams

2023 ©