Description
Our neck pillows are filled with organic rice, flax seed and lavender, featuring a cotton pillow inside with baffle construction and a soft flannel cover that is washable. These are freezer and microwave safe.
They are 30″ height and 11 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.
Removable flannel cover is washable: cold water and hang to dry. Do not wash inside pillow.
To Heat: place neck pillow in microwave and heat at 15 sec intervals on medium setting until it reaches desired temperature.
To Cool: place pillow in a ziplock plastic bag in the freezer until it reaches desired temperature.