Description
Using repurposed hemp cacao & coffee bean bags pared with durable broadcloth, our beach bag is popular for outings or for toting groceries. Handcrafted using 50% post-consumer materials gives the planet a break!
Beach Bags are 27 1/2′′ height and 15 1/2′′ width.
All sweet dreams products are hand-crafted therefore size is slightly approximate.
Do not wash as burlap will shed. If stained can spot wash the broadcloth and straps. Do not leave in direct sunlight.